2024-CRF-01 Day Ahead Market Optimization / SWEDE Limits (Long)
NV Energy is a sponsor to the CRF and would prefer Rodger Manzano to represent NV Energy on the task force.
2024-CRF-02 Earlier FS Metrics / Monthly Volatility (Long)
NV Energy is a sponsor to the CRF.
2024-CRF-03 Demand Response QCC (Medium)
No response submitted.
2024-CRF-05 Load Growth Factor (Long)
NV Energy would like to nominate Rodger Manzano for the task force. NV Energy shares the same concern with the CRF sponsor, APS, that an inaccurate load growth rate could adversely affect resource adequacy metrics and hinder the goal of WRAP. As part of this task force NV Energy would be able to share its experience with load growth with the greater region.
2024-CRF-08 CAISO Firm Transmission (Short)
NV Energy would like to nominate Rodger Manzano for the task force. NV Energy has a strong interest in change request 2024-CRF-08 as a neighboring transmission system to CAISO and engagement with CAISO’s transmission products.
2024-CRF-10 Capability Testing Off-Season (Short)
NV Energy would like to nominate Lindsey Schlekeway for the task force. NV Energy agrees with SRP’s change request to permit historical operational data or adjusted off-season tests to meet testing requirements when testing during the summer season is not possible due to system conditions, specifically in the Desert Southwest.
2024-CRF-12 ELCC by Vintage / Indicative QCC for Long-Term Storage (Long)
NV Energy would like to nominate Lindsey Schlekeway for the task force. NV Energy believes that accurately calculating the QCC for new and existing resources is key to meeting reliability and properly capturing the addition of new resources. Appropriate QCC accreditation provides NV Energy and WRAP participants with more confidence with resource planning.
2024-CRF-14 Joint Owner Flexibility (Short)
NV Energy would like to nominate Rodger Manzano for the task force. NV Energy currently has or expects to be engaged in jointly-owned resources and has an interest in the development of this specific change request.
2024-CRF-15 Planned Outage Clarification (Short)
No response submitted.
General Comment