Content archive

News

Documents, news, and open comment topics from across Western Power Pool.

News

WRAP Announces Full Participation of Phase 3A

PORTLAND, OR – The Western Resource Adequacy Program (WRAP), administered by the NWPP, is pleased to announce that it has entered the first stage of program implementation, Phase 3A.

This non-binding phase welcomes eight new participants to the WRAP. The participants in Phase 3A of the WRAP are: Arizona Public Serv…

News

WPP to be led by transmission expert Sarah Edmonds

For more information, please contact: Bill Drummond, 406-544-0510 or WKDrummond@comcast.net

[PORTLAND, Ore.] – The Northwest Power Pool Corporation, doing business as the Western Power Pool (WPP), announced today its Board of Directors has selected Sarah Edmonds as President and CEO. WPP is a nonprofit corporation …

News

2022.06.30 WRAP Program Design Webinar

WRAP webinar focusing on transmission demonstration and exceptions, Forward Showing capacity requirement, and how loads participate along with a brief overall WRAP update.

News

First Full Set of Non-Binding Data Highlights Importance of WRAP

PORTLAND, Ore. – Current participants in the Western Resource Adequacy Program (WRAP) project a changing resource mix within the next five years, according to the proposed resource portfolios analyzed for the first non-binding phase of the WRAP. The modeling and its resulting set of metrics, including increasing requi…

News

NWPP Announces Rebrand to Western Power Pool

PORTLAND, OR - Throughout its evolution over the last 80 years, the Northwest Power Pool (NWPP) has cooperatively addressed the present needs of the region, as it continues to do with today's unique challenges. The industry and the region rely on the NWPP to provide reserve sharing, operational collaboration, and trai…

News

NWPP President Frank Afranji Announces Retirement

Update: Frank Afranji will be staying on board as NWPP President through approximately late March. 

PORTLAND, OR – Frank Afranji, President of the Northwest Power Pool Corporation (NWPP Corporation) announced today that he will be stepping down from that role and retiring in January 2022. Afranji has been the NWPP …

News

NERC Lessons Learned - Episode 8

SINGLE PHASE FAULT PRECIPITATES LOSS OF GENERATION AND LOAD

Below is the full transcript for this episode. If you'd like to review or follow along with the original .pdf version of this NERC Lesson Learned, visit: https://www.nerc.com/pa/rrm/ea/Lessons%20Learned%20Document%20Library/LL20201001_Single_Phase_Fault_Pr…

News

NERC Lessons Learned - Episode 9

MIXING RELAY TECHNOLOGIES

Below is the full transcript for this episode. If you'd like to review or follow along with the original .pdf version of this NERC Lesson Learned, visit: https://www.nerc.com/pa/rrm/ea/Lessons%20Learned%20Document%20Library/LL20200701_Mixing_Relay_Technologies_in_DCB_Schemes.pdf

Chris S…

News

NERC Lessons Learned - Episode 10

COLD WEATHER OPERATION OF SF6 CIRCUIT BREAKERS

Below is the full transcript for this episode. If you'd like to review or follow along with the original .pdf version of this NERC Lesson Learned, visit: https://www.nerc.com/pa/rrm/ea/Lessons%20Learned%20Document%20Library/LL20201101_SF6_CB_Operation_during_Cold_Weath…

News

Open Position - Transmission Planning Engineer

Overview
The Northwest Power Pool (NWPP) is seeking a full-time engineer to join its transmission planning team. The engineer will develop power system models, analyze power systems, and contribute to the NWPP training materials. The NWPP is open to hiring an entry-level, mid-level or Senior Engineer depending on qua…

News

Power Insights: Episode 1 - DER Data Collection For Modeling And Transmission Studies.

The following is a transcript of our Power Insights podcast, Episode 1 DER Data Collection For Modeling And Transmission Studies. 

Dave Angell: I'm Dave Angell and I'm with the Northwest Powerpool and this is a podcast on the NERC DER data collection for modeling and transmission studies. And this is based on a gui…

News

Power Insights podcast: Episode 2 - San Fernando Event.

The following is a transcript of our Power Insights podcast, Episode 2 San Fernando Event.

Dave Angell: Well, good day to you. This is Dave Angell from the Northwest Power Pool and today, I'll be talking with some folks representing NERC and we're going to talk about the San Fernando Disturbance. I just want to let…