No response submitted.
For the Forced Outage definition: does the reference to “capacity” pertain to capacity or QCC? Bonneville recommends that the definition be modified to include the following:
Storage Hydro QCC, and
loss of generating capability due to emergency transmission line outage
No response submitted.
The “Forced Outage” definition references “generating units”. Consistent with the tariff’s section 20.1.1, constrained firm transmission service rights are cited as a cause for Forced Outage. SRP requests confirmation that the document’s definition of Forced Outage aligns with the tariff. SRP requests clarity on what is intended to be captured in “generating units”, including whether Energy Storage Resources (sometimes called “Non-Generator Resources” in our region) are generating units.